The initial visit to determine the root cause of low water pressure was identified to be as a result of inadequate pipe sizing. A rescheduled date was set up, and the team arrived on time as scheduled - 8am sharp on a 37 degree outside temperature day. They also coordinating with the local gas company to report to the site to identify and label where the gas pipe is located in relation to the underground water pipe..
The team started the water pipe replacement process at approximately 8:30am, and successfully replaced the existing 3/4" pipe to 1" copper pipe, from the street to the house, approximately 30' of length.
The plumbing team were very professional and advised me on every step of the process and with 5hrs, the job was completed
More importantly the staff and scheduling team was excellent, very courteous and friendly.
Would highly recommend...
Read more >
Mohamed Zabar gave Allied/All-City Plumbing a
5 star Review